Friday, August 29, 2025
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Email Whitelisting
Best Retirement Wishes
  • Economy
  • Editor’s Pick
  • Investing
  • Stock
  • Top News
No Result
View All Result
Best Retirement Wishes
Home Stock

It Is Not Too Late to Rethink the Second Avenue Subway

by
November 2, 2023
in Stock
0
It Is Not Too Late to Rethink the Second Avenue Subway
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

Marc Joffe

The New York Metropolitan Transportation Authority is moving forward with plans to extend its Second Avenue Subway, incurring unprecedented costs and potentially jeopardizing the transit system’s state of good repair. Before shovels go into the ground, federal and local officials should consider shortening or even shelving this project.

Related posts

RICO, But Not Suave: President Trump Threatens George Soros with Dragnet Justice

RICO, But Not Suave: President Trump Threatens George Soros with Dragnet Justice

August 28, 2025
Trump’s “State Capitalism … a Hybrid Between Socialism and Capitalism” Won’t Make America Great Again

Trump’s “State Capitalism … a Hybrid Between Socialism and Capitalism” Won’t Make America Great Again

August 28, 2025

The Second Avenue Subway Phase 2 promises to add 1.76 miles of track and three new stations in Upper Manhattan at an estimated cost of $7.7 billion, working out to more than $4 billion per mile.

Planners and transit advocates see the extension as long overdue. The Second Avenue Subway was first proposed in 1920 and a portion of the tunnel was dug in the early 1970s before the New York City financial crisis. Meanwhile, elevated lines on Manhattan’s East Side were demolished, leaving the Lexington Avenue line (the sole north‐​south subway on the East Side) with more passengers than it could handle by the early 2010s.

But subsequent events have reduced pressure on the Lexington Avenue line and thus the necessity of this project. Overall subway ridership peaked in 2014 and fell 6 percent by 2019 before cratering with the onset of the COVID pandemic. Ridership is now rebounding but is expected to remain below pre‐​pandemic levels for the foreseeable future. Also, ridership is less concentrated at rush hours when the Lexington Avenue line’s capacity was being exceeded.

In addition, the first phase of the Second Avenue Subway has taken riders off the Lexington Avenue line, further relieving pressure on the 4, 5 and 6 trains (for readers outside New York City, it is worth noting that Second Avenue and Lexington Avenue are only 0.2 miles apart, or about a five‐​minute walk).

If capacity pressure on the Lexington Avenue line returns, the MTA has a less costly alternative to building a new subway extension. It could replace the Lexington Avenue line’s antiquated signaling system with Communications‐​Based Train Control (or CBTC), which uses “wireless connectivity to keep trains in constant contact with a centralized system that controls their movement.” This advanced signaling system has already been implemented on two other New York subway lines. It would allow MTA to run trains closer together on the line increasing its capacity.

Project advocates contend that East Harlem is a transit desert, a place where underprivileged residents have insufficient access to public transportation. But a bus rapid transit line already serves the area. The line, M15 Select Bus Service (SBS), begins in East Harlem, parallels the Second Avenue Subway through the Upper East Side, and terminates at South Ferry, running south on 2nd Avenue and north on 1st Avenue. SBS lines differ from local buses in that they have dedicated and enforced bus lanes, curbside fare collection, and longer intervals between stops—approximately the same as the distance between subway stops—all to speed up travel.

A Shorter, Less Expensive Option

If MTA decides to pursue the expansion, it could get some of the passenger convenience benefits at much lower costs by shortening the project. The planned terminus at 125th and Lexington Avenue, to provide a transfer to the Lexington Avenue line, involves adding a curve at 125th Street and tunneling under Lexington Avenue tracks. By terminating at 125th and 2nd, MTA would avoid the necessity of digging this deeper tunnel. It would also limit construction‐​related disruptions to users of 125th Street, a busy commercial thoroughfare.

If MTA concludes that a free transfer at 125th Street is essential, it could fulfill that need more economically by providing an underground walkway between Second and Lexington Avenues.

A shorter project would mostly use the tunnels previously dug in the early 1970s, which MTA has been maintaining ever since. MTA could further reduce costs by building more modest stations at 106th Street and 116th Street. In their analysis of Phase 1 of the Second Avenue Subway, researchers at NYU’s Transit Cost project found that the new MTA stations at 72nd, 86th, and 96th Streets had much more excess space than comparable metro stations in Europe. Overbuilding stations requires additional excavation which can greatly increase the costs of construction.

Congestion Pricing and Funding Risk

This week, the Federal Transit Administration is committing to provide $3.4 billion of the project costs, leaving MTA responsible for the remaining $4.3 billion, along with any cost overruns (although it should be noted that MTA’s project budget includes a large contingency to absorb such overruns).

One source of MTA funds is supposed to be the proceeds of a $15‐​billion bond issue whose principal and interest are to be repaid by the proceeds of New York City’s new congestion pricing system. This new system will collect tolls from most of the motor vehicles travelling through the city’s downtown core.

But because congestion pricing is untested in the US and MTA has yet to establish key parameters of the congestion pricing system such as toll levels, discounts and exemptions, the amount of revenue the new system will realize is uncertain. New York State legislation requires that the city’s congestion pricing raise at least $1 billion per year. But it remains to be seen whether projected revenues are ultimately realized. Further, the congestion pricing initiative is facing lawsuits from New Jersey, which may delay implementation or limit annual revenues. Finally, the recent spike in municipal bond interest rates will make it more challenging to service the $15‐​billion bond issue.

If MTA experiences extreme cost overruns on the Second Avenue Subway Phase 2 project and/​or does not receive enough congestion pricing proceeds to service its bonds, it will be challenged to fund its full capital program, which includes money for making basic repairs. The Second Avenue Subway project could thus jeopardize MTA’s ability to keep the subway system in a state of good repair. As a result, safety and reliability issues that plagued the subways in the 1970s and again in the 2010s could return.

Rather than take on these risks, MTA should review its longstanding plans for the Phase 2 project. Given lower ridership on the subway system and escalating costs, a more modest extension or no extension at all would be more prudent options.

Previous Post

The Current US Economic Situation from an Austrian Viewpoint

Next Post

Coauthor of War College Journal Article Tries to Backtrack on Call for “Partial Conscription”

Next Post
Coauthor of War College Journal Article Tries to Backtrack on Call for “Partial Conscription”

Coauthor of War College Journal Article Tries to Backtrack on Call for "Partial Conscription"

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Get the daily email that makes reading the news actually enjoyable. Stay informed and entertained, for free.
Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

RECOMMENDED NEWS

How a CBDC Created Chaos and Poverty in Nigeria

How a CBDC Created Chaos and Poverty in Nigeria

2 years ago
Happy Yeltsin Supermarket Day!

Happy Yeltsin Supermarket Day!

2 years ago
American Compass Dystopia: Americans’ “Stagnant” Income

American Compass Dystopia: Americans’ “Stagnant” Income

2 years ago

Great Moments in “Buy America”

2 years ago

BROWSE BY CATEGORIES

  • Economy
  • Editor's Pick
  • Stock
  • Top News
Get the daily email that makes reading the news actually enjoyable. Stay informed and entertained, for free.
Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

POPULAR NEWS

  • How not to answer the question “Why are carbon taxes unpopular with policymakers and politicians?”

    0 shares
    Share 0 Tweet 0
  • How Can We Restore Freedom and Sound Money in the US and the UK? Some Ideas

    0 shares
    Share 0 Tweet 0
  • The New Deal and Recovery, Part 28: A New Deal for Housing

    0 shares
    Share 0 Tweet 0
  • You Can’t Depend on the State to Maintain Public Order

    0 shares
    Share 0 Tweet 0
  • Remember the Alamo! Moses Rose’s Last Stand

    0 shares
    Share 0 Tweet 0

Disclaimer

BestRetirementWishes.com, its managers, its employees, and assigns (collectively "The Company") do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

Recent News

  • RICO, But Not Suave: President Trump Threatens George Soros with Dragnet Justice
  • Trump’s “State Capitalism … a Hybrid Between Socialism and Capitalism” Won’t Make America Great Again
  • Public Corruption by State

Category

  • Economy
  • Editor's Pick
  • Stock
  • Top News

Recent News

RICO, But Not Suave: President Trump Threatens George Soros with Dragnet Justice

RICO, But Not Suave: President Trump Threatens George Soros with Dragnet Justice

August 28, 2025
Trump’s “State Capitalism … a Hybrid Between Socialism and Capitalism” Won’t Make America Great Again

Trump’s “State Capitalism … a Hybrid Between Socialism and Capitalism” Won’t Make America Great Again

August 28, 2025
  • About Us
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
  • Email Whitelisting

© 2021 BestRetirementWishes. All Rights Reserved.

No Result
View All Result
  • About Us
  • Contact Us
  • Email Whitelisting
  • Home 1
  • Privacy Policy
  • suspicious-engagement
  • Terms & Conditions
  • Thank You

© 2021 BestRetirementWishes. All Rights Reserved.